1. Hydraulically: Hydraulic lifting arrangement can be done on the top of the three Towers as shown in the Fig 2.With the help of a control unit the raising and lowering of the towers can be controlled till the specified height. The tower must be raised within a short period of time and as soon as the sphere S1 reaches the next point it must lower down only till half of its raised height.