Equipotential bonding for power supply installations at LPZ 0A and LPZ 1
In analogy to metal installations, all electrical power lines and data links at the entrance
of the building (LPZ boundary 0A to 1) must be integrated into the equipotential
bonding. The following section will look in more detail at the design of equipotential