We really need now to speed up for both septic and transformer.
For the septic (which is actually a biochemical tank, not a simple septic) , I still need to know :
• If it can take black and grey water
• Where is the sludge store inside the tank ?
• If we need a prepond. But from today, we decided that we will use a pre-pond (small tank before septic) to collect underground the sewage water, then we will need a sub merged pump (for black water) that will send the sewage water to the septic that we will locate overground (easier to sset up, connect and maintain)
For the transformer, the supplier already did the installation here, so I’m not clear what we need to send him more now that we have the watt meter specs. If needed, supplier can send someone to come and to check. What do you think ?
Please let me know as these 2 parts are key now.