Sorry to reply to you today since last visiting. Cos I went to Shanghai immediately after the trip
There are couple of things we have discussed during the meeting.
1. For all problems with the cable, our factory confirmed they will pay more attention on packing. For the packing inside cable printing and out side mark different, cos they try to catch the delivery time that they utilized their stock for it. I have emphasized to them, any changes must be informed.
2. For the stock, I have mentioned to Italy, would you pls. send the stock list you want, then after we see what we can do.
3. Spiral cable, we confirmed that we can do it. The update drawing will be sent to you by Jody.
4. Cable speck for catalog, Jody will send to you, the description will follow too.
5. credit, the payment terms is 30 days of goods arrival at Inspire warehouse.
6. For the reeling, I have asked several suppliers. There are some questions.
1. How heavy per drum you need this reeling to carry
2. What type of machine you need, automatic, or menu.
7. For Wanchai: the spec of cat5e with TPU jacket, Jody will send to him.
(the sample brought over)
8. USB3.0, USB2.0 dynamic version for industrial camera. Pls. see attached spec.
9. On going, for Japanese supplier I am still working on it.
10. For single core, we will send the quotation as soon as we can.
11. For the project, we have tried many suppliers in China. But the price is not as good as Italy,