Project Phase II (individual)
1. Research the location of your branch. The weather, terrain, natural disaster, crime rate, etc.
2. Identify which threats from the first phase are relevant to your locale.
3. Assign risk level to each threat.
4. Create an action plan specific to your assigned branch.