Prepare for Isolation
5.1.1 Verify equipment is ready for isolation
- Identify the equipment that need to isolate.
- Equipment has been properly isolated and prepared to work.
5.1.2 Developing the Equipment Isolation Checklist (EIC)
- Equipment shall develop or obtain existing Equipment Isolation Checklist (EIC) for equipment isolation requiring energy isolation points. EIC must be reviewed and approved by Shift supervisor and Safety officer.
- Equipment shall verify in the field that the EIC is accurate for the work being performed.