Generated wastewater from various units is collected through the open channel system. Domestic wastewater of the mill is collected separately.
Industrial and domestic wastewaters are then combined
in a basin and discharged to the municipal sewage system, after pH adjustment in the basin, if necessary.
The composite wastewaters mostly meet the sewage discharge standards set by the municipality. Waste flue gas emission (from steam boilers), solid wastes and hazardous solid wastes are the other pollutant outputs of the mill.
This study was conducted in three phases.
In the first phase, onsite investigations were performed in the mill for about four weeks and detailed process analysis was done.
All necessary data on production inputs (raw materials, water, energy, steam, chemicals/ dyestuff, etc.) and outputs was collected for 2010e2012 period.
Wastewater samples from all sources of the production processes were collected along with the composite wastewater discharged to the municipal sewage system.
Groundwater and softened process water samples were also collected. From all these sampling points, a total of three sample set was collected in different periods during two months to represent different dyeing recipes.
The samples were analyzed for various parameters including COD, BOD5, total organic carbon (TOC), TSS, TN, color, conductivity, hardness, pH, etc., employing the relevant Standard Methods (APHA, 1997).
BOD5 analysis was performed according to Standard Method 5210-B. COD analysis was performed according to Standard Method 5220-D (closed reflux colorimetric method) using Hach-Lange DR5000 spectrophotometer.
TOC analysis was performed by the high temperature combustion method (Standard Method 5310-B) using a high-sensitivity TOC Analyzer (TOC-VCPH, Shimadzu).
TN was measured spectrophotometrically according to Standard Method 4500-N-B (persulfate digestion method).
Composite samples (2 h) were collected mostly in duplicate. Furthermore, analytical measurements of each sample were conducted in triplicate.
Generated wastewater from various units is collected through the open channel system. Domestic wastewater of the mill is collected separately.
Industrial and domestic wastewaters are then combined
in a basin and discharged to the municipal sewage system, after pH adjustment in the basin, if necessary.
The composite wastewaters mostly meet the sewage discharge standards set by the municipality. Waste flue gas emission (from steam boilers), solid wastes and hazardous solid wastes are the other pollutant outputs of the mill.
This study was conducted in three phases.
In the first phase, onsite investigations were performed in the mill for about four weeks and detailed process analysis was done.
All necessary data on production inputs (raw materials, water, energy, steam, chemicals/ dyestuff, etc.) and outputs was collected for 2010e2012 period.
Wastewater samples from all sources of the production processes were collected along with the composite wastewater discharged to the municipal sewage system.
Groundwater and softened process water samples were also collected. From all these sampling points, a total of three sample set was collected in different periods during two months to represent different dyeing recipes.
The samples were analyzed for various parameters including COD, BOD5, total organic carbon (TOC), TSS, TN, color, conductivity, hardness, pH, etc., employing the relevant Standard Methods (APHA, 1997).
BOD5 analysis was performed according to Standard Method 5210-B. COD analysis was performed according to Standard Method 5220-D (closed reflux colorimetric method) using Hach-Lange DR5000 spectrophotometer.
TOC analysis was performed by the high temperature combustion method (Standard Method 5310-B) using a high-sensitivity TOC Analyzer (TOC-VCPH, Shimadzu).
TN was measured spectrophotometrically according to Standard Method 4500-N-B (persulfate digestion method).
Composite samples (2 h) were collected mostly in duplicate. Furthermore, analytical measurements of each sample were conducted in triplicate.
การแปล กรุณารอสักครู่..
สร้างน้ำเสียจากหน่วยต่าง ๆเก็บข้อมูลผ่านระบบช่องเปิด น้ำเสียชุมชนของโรงเก็บแยกต่างหาก
อุตสาหกรรมและในประเทศน้ำทิ้งแล้วรวม
ในอ่างและปล่อยออกสู่ระบบบำบัดน้ำเสียเทศบาล หลังจากการปรับค่าพีเอช ในอ่าง ถ้าจำเป็น
รวมกิจกรรมส่วนใหญ่พบน้ำเสียไหลมาตรฐานที่กำหนดโดยเทศบาลการปล่อยแก๊สเสียfl UE ( หม้อไอน้ำ ) , ของเสียอันตราย และของเสียอื่น ๆซึ่งเป็นสารมลพิษจากโรงสี
การศึกษาดำเนินการใน 3 ระยะ
ในจึงตัดสินใจเดินทางไปโรงแรมได้ในขั้นตอนการบดประมาณ 4 สัปดาห์ และวิเคราะห์กระบวนการรายละเอียดทำ .
ข้อมูลที่จำเป็นทั้งหมดในปัจจัยการผลิต ( วัตถุดิบ , น้ำ , พลังงานไอน้ำ , ดิบสารเคมี / ย้อม ฯลฯ ) และผลคือเก็บช่วง 2010e2012 .
น้ำเสียตัวอย่างจากแหล่งที่มาทั้งหมดของกระบวนการผลิต ศึกษาพร้อมกับน้ำเสียรวมส่งไประบบบำบัดน้ำเสียเทศบาล
น้ำใต้ดินและนิ่มน้ำกระบวนการยังเก็บ จากตัวอย่างเหล่านี้ จุดทั้งหมดสามตัวอย่างชุดเก็บข้อมูลในช่วงเวลาที่แตกต่างกันในช่วงสองเดือนที่เป็นตัวแทนที่แตกต่างกันการย้อมสีเค้ก .
ตัวอย่างวิเคราะห์พารามิเตอร์ต่างๆรวมทั้งค่า factor อินทรีย์คาร์บอนทั้งหมด ( TOC ) , TSS , TN , สี , ไฟฟ้า , ความแข็ง , pH , ฯลฯ การใช้มาตรฐานที่เกี่ยวข้องวิธีการ ( apha , 1997 ) .
การวิเคราะห์ factor ได้ปฏิบัติตาม 5210-b. วิธีมาตรฐานการวิเคราะห์ซีโอดีได้ปฏิบัติตาม 5220-d วิธีมาตรฐาน ( ปิดอีกครั้งfl ux Colorimetric Method ) โดยใช้ HACH Lange dr5000 วัสดุ
วิเคราะห์ TOC การวิเคราะห์โดยวิธีการเผาไหม้ที่อุณหภูมิสูง ( 5310-b วิธีมาตรฐานโดยใช้ความไวสูง TOC วิเคราะห์ ( toc-vcph Shimadzu , )
วัดนี้ 4500-n-b TN ตามวิธีมาตรฐาน ( วิธีการย่อยอาหาร Persulfate )
ตัวอย่างประกอบ ( 2 ชั่วโมง ) จำนวนมากในที่ซ้ำกัน นอกจากนี้ การวัดวิเคราะห์ของแต่ละตัวอย่างทดสอบ
ทั้งสามใบ
การแปล กรุณารอสักครู่..