I have had a conversation with the vibration engineers and it is like this
We need to do a 2 time balancing first one time and start and stop the machine and do a second time balancing prior to the result of the first balancing .
There is no point of doing a one time balancing now if we cant do a second time directly after.
There is a possibility to do the balancing later along with the next inspection if there is no increase in the vibrations
Please confirm as soon as possible your statement about this and let us know!