MC agrees on PLE’s proposed water treatment lay down with comment as attached. Proposed Laydown area 2 is also accepted but please be informed that PLE shall remove all materials immediately after piling work is completed. This area is intended for Stack Contractor. As for Laydown area 1, it is not acceptable. Laydown area 1 should be moved to east side of D25 .