5.2 PRICES ARE INCLUDING
- Control panel and cabling. This comprises the design and supply of the complete software control
and in addition the supply of all the necessary installation material from the machines control
panels to the motors, pneumatic valves and other control units.
- Pneumatic installation. This comprises the supply of all the necessary compressed air lines and
accessories from the connection points (generally in the same place as the control panels) to the
pneumatic elements in the installation.
- Assembly and testing of the complete machine line in our factory.
- First training at our factory
- Factory Acceptance before delivery.
- Transportation (Packing, loading, transport insurance, Transport/ shipping costs), according to
section 3.1.
- Installation, travelling & lodging expenses, according to section 3.2.
- Instruction and training of personnel, according to chapter 12.
- Commissioning of the machine (line), according to chapter 13.
- One service visit by a Viscon technician, including training of the operators, one year after commissioning
5.2 5.2 PRICES ARE INCLUDING
- นี้ประกอบด้วยการออกแบบและอุปทานของการควบคุมซอฟต์แวร์ที่สมบูรณ์และนอกจากนี้อุปทานของทั้งหมดที่ติดตั้งวัสดุที่จำเป็นจากเครื่องควบคุมการติดตั้งมอเตอร์วาล์วนิวเมติกและหน่วยงานควบคุมอื่นๆ - - Control panel and cabling. This comprises the design and supply of the complete software control
and in addition the supply of all the necessary installation material from the machines control
panels to the motors, pneumatic valves and other control units.
- Pneumatic installation. This comprises the supply of all the necessary compressed air lines and
accessories from the connection points (generally in the same place as the control panels) to the
pneumatic elements in the installation.
- Assembly and testing of the complete machine line in our factory.
- First training at our factory
- Factory Acceptance before delivery.
- Transportation (Packing, loading, transport insurance, Transport/ shipping costs), according to
section 3.1.
- Installation, travelling & lodging expenses, according to section 3.2.
- Instruction and training of personnel, according to chapter 12.
- Commissioning of the machine (line), according to chapter 13.
- One service visit by a Viscon technician, including training of the operators, one year after commissioning