For the reduction of energy, a new ventilation system should be installed in an existing office building. The engineer who is responsible for the planning of the technical installations in the company enters the technical room with his mobile computing system. With the smartphone integrated video camera , he capture the room. Using the annotation tool, he can scribble is an overly to the captured picture where the main components of the service installation should be placed.