Dear Chetsuda-san,
We have request matters to you for OLIC job as follows.
My business trip that I planned for from 20 to 26 on December in Thailand was called off.
Please e-mail me if you want to confirm it.
1. Preparation and construction of protection materials of the construction area
Specifications: Blue sheet + plastic corrugated cardboard
2. Construction of the upper duct of PS-101 Please see attached file.
3. Please bring the power supply cables from a switchboard of Taikisha to the container office at the time of container office setting of 1/7.
4. About the SUS cover of the setting part of the 1,200L tank, please construct it with the preparation for parts.
PATKOL, please prepare the orange part.
Please see attached file.
5. I attach an instrumentation construction drawing Please confirm it.
6. Please send a cable tray, the list of parts to me by the contents of the thing that you e-mailed on December 18.
7. Please prepare illumination, a cord, an outlet to use on a ceiling.
(based on the preliminary inspection contents which, on December 2, went on
3rd)
8. Work to assemble U301
Please see attached file.
9. Work about a perforator and the end and the coking of a wall, the ceiling
10. About getting out sample peace of the welding condition, please cope including material.
With material 1.5S, 1S, 15A, SUS316L sanitary pipe of 8A, please prepare for each four of them.
11. Please prepare a fiberscope.
(for the photography of the manual operation welding point)
12. Please submit the qualification of the scholar of welding qualification and the inspection record of the welder to use. (a deadline for
presentation: on December 25)
Best regards,
Yasuma(IWAI-PT)
Dear Chetsuda-san,We have request matters to you for OLIC job as follows.My business trip that I planned for from 20 to 26 on December in Thailand was called off.Please e-mail me if you want to confirm it.1. Preparation and construction of protection materials of the construction area Specifications: Blue sheet + plastic corrugated cardboard2. Construction of the upper duct of PS-101 Please see attached file.3. Please bring the power supply cables from a switchboard of Taikisha to the container office at the time of container office setting of 1/7.4. About the SUS cover of the setting part of the 1,200L tank, please construct it with the preparation for parts.PATKOL, please prepare the orange part. Please see attached file.5. I attach an instrumentation construction drawing Please confirm it.6. Please send a cable tray, the list of parts to me by the contents of the thing that you e-mailed on December 18.7. Please prepare illumination, a cord, an outlet to use on a ceiling.(based on the preliminary inspection contents which, on December 2, went on3rd)8. Work to assemble U301 Please see attached file.9. Work about a perforator and the end and the coking of a wall, the ceiling10. About getting out sample peace of the welding condition, please cope including material. With material 1.5S, 1S, 15A, SUS316L sanitary pipe of 8A, please prepare for each four of them.11. Please prepare a fiberscope.(for the photography of the manual operation welding point)12. Please submit the qualification of the scholar of welding qualification and the inspection record of the welder to use. (a deadline forpresentation: on December 25)Best regards,Yasuma(IWAI-PT)