During the cost estimation it is often needed to divide the manufacturing costs into additional elements, and
determine the detailed manufacturing costs. It may have several reasons. Based on the result the reality of the
estimated cost is evaluated. The load and capacity analysis of the manufacturing system can be performed
and the shipment time can be estimated more accurate.The content of the detailed cost data is determined by the
structure of the manufacturing system. It contains that cost of performed machining in CNC milling machines,
EDMs, drilling machines, etc.