Surasit, Parinya,
We will make site survey at FMC for cost estimation.
1) Dispatch Sukawat to survey site on June 16, 2016.
2) Check with Joke and see Joke need to dispatch his team to survey site or not.
If yes, make appointment with Joke to meet his team at FMC main gate.
3) They need to attend brief safety training before survey site, then prepare all required PPE for them and let Joke know too.
4) Let Ying know who will survey site within this morning.
5) Your cost estimation shall include making summary of all works performed at site, photographic reports and how to solve the problem detected and presentation after job completed.
This will affect our costs a lot.