Distance is an important point in the electricity distributing system. The palm biomass power plant has not more
than 10 km from POM to grid line [8]. A long distance will increase cost investment in the grid line and inefficient
electricity distribution. The distance from POM to the national grid line is available in Fig 2. Most of POM is
located not more than 1 km from the low voltage (71% POM) and medium voltage (48% POM) grid line.