Bang Pakong Combined Cycle (Unit l-2 Replacement) Project Technical Document Room Doors Windows Floor Finish Wall Finish Ceiling Others Electrical Room Double-leaf steel door with glazing Standard fixed /operable aluminum system with glass Trowelled finish concrete floor Masonry wall with plastering and painting Exposed ceiling with painting Battery Room Steel door Standard fixed/operable aluminum system with glass Acid resistant epoxy floor finished Acid resistant wall finished up to 1.5 m high from finished floor level. Wall above 1.5 m from floor level shall be masonry wall with plastering and painting Exposed ceiling with painting - Note 1 - Ventilation fan shall be provided at floor level. - An emergency eye wash and shower with sink shall be provided. Conference Room and Office Rooms Double-leaf aluminum door with clear glass for Conference Room Single-leaf aluminum door with clear glass for Office Room Standard fixed/operable aluminum system with glass Ceramic floor tile with aluminum skirting Masonry wall with plastering and painting Suspended, exposed grid, acoustical type Meeting table and chairs, sound system, and screen shall be provided for Conference Room. Office facilities shall be provided for Office Rooms. Volume 2 P3ge2A'9