Field inspection & verfication, no combustible material on site now. However, if SABIC use this WH, our product and pallet are classified as combustible material. Then heating systems at a distance of at least 1.5 m must followed.
Pls advice if this would be a concern, i.e. will there be 1.5m distance minimum from all racks to any potential heating systems?