Figs. 7 and 8 present the results of computer modeling for
transient ventilation of buildings with a conducting roof and
a window at the entrance, 1, 5 and 15 min after the ventilation starts. The examples presented in the figures were
obtained for the absorbed heat flux of 200 W/m2. The same
trends have been found for the flux of 70 W/m2.