Under original rules, only project to 2MW or smaller qualified for fast – track interconnection – all other and to carry out costly and time – consuming studies. One change revises fast – track eligibility for systems up to 5 MW, based upon individual system and resource characteristics. The new rule also creates a pre-application report process that enables generators to obtain available system information which will assist small generators in evaluating the potential costs and time frame associated with their project.