It was not goal of this paper to discuss the engineering challenges,the team encountered,neither the proposed solutions to lift the 50 t Sail-Wing and hold it steady in 30 knots wind-gushes. In the following phase of detail-engineering,this issue will require special attention like every 600 kW machine developed so far.