The challenge
St. George needed a system for a phased, multi-block development that could operate on a site-wide IP backbone. The system needed to offer complete flexibility in terms of the number of concierges and where they were located. As with most developments of this nature, being able to relocate the concierge as the building work progresses is vital. An IP-based system now allows this by simply unplugging the RJ45 connector and moving the concierge PC to another location.