8. Ground water levels in all wells, whethern sampled or not, and all piezometers must be measured to the nearest 0.01 foot and reported semiannually unless required more frequently by permit condition. All water level measurements must be made within a one day period. These measurements must be referenced to the National Geodetic Vertical Datum of 1929 (NGVD)