Dear Kwang-san and Alisa-san,
Regarding CB of Gulf #1-1 (1pce) and #1-2 (2pcs), I would like you send us approved record of after coating removal (for base metal check) as follows.
This inspection is a part of incoming inspection, so, please put the record into Repair Plan Report by issuing Revise 1.
In order to record the changing points and reason, could you do as follows?
(1) Original Sammary has a sentence saying "inspected under coating condition ............".
In new Sammary, please do not delete the sentence.
But, after the sentence, please additionally mention that EDS performed inspection under coating removal condition for XX pieces and the results (change of repair level, option etc, if any).
(2) Please put Revision History in the Appendix.
In Revision History, please mention "Rev.1: following results of inspection under coating removal condition for base metal check".
If you have any question, please feel free to contact us.
Kawaoka
---