2) Driving Range Area
Existing Status
The Contractor did not include this in the Scope of Work due to not knowing what would be designed and built in this area.
Proposed Action
The Contractor will be happy to grass this area at our own cost during the grow in period, but will not be responsible for damage caused during Construction of the net support system or weakness of the grass due to future shade from nets