2 Materials
2.1 Description
2.1.1 Power cables shall be single, two, three, or four contractor depending as
indicated as on the Drawings.
2.1.2 All cables shall be suitable for indoor and outdoor installations, wet and
dry locations, exposed to sunlight, in condult, in cable tray as appropriate