description
1. objection YLA ALL SUPPLY PARTS
BODY SHEET METAL,INTERIOR EXTERIOR,POWERTRAIN,ENGINE ALL PARTS
2.guidelines of implementation
it will carry out by initial control plan by your company's rule
or it will carry out by quality checking result on production preparation stage or by process design plan during the quality stabilization will confirm.
3.Period of initial control : 3month or 1000 vehicle (whichever is longer)
A characteristic that production quality will be not able to stabilize on quzlity evaluation continuetill becoming stable.
4.document and deadline for submit ion
Submit ion is a & functional parts and designation supplier.
implemented result (1st month ) 10.oct.2014
We'd like you to submit the putting data of cancel declaration (summary)at the time of shift to normal control after finishing initial quality flow control.
5.Thorough inspection on and after stage
thorough inspection will be carry out with introducing the process and shipment double check etc.
Specially re-confirm the quality problem on PP,MP,during on your company trial.