Calculate the lime requirement of the pond bottom soil. The upper
15 cm of soil within which lime typically reacts has an average
weight of 1,500,000 kg ha−1; thus the factor relating SCaCO3 to lime
requirement is based on the relationship that 1.0 mg CaCO3 kg−1 is
equivalent to 1.5 kg CaCO3 ha−1: