I’m told you might be able to help me with the following.
Bellow shows two different part costing from 2 DD models (the parts are different sizes and shapes hence the main cost differences) the discrepancy I’m interested in is highlighted in Yellow. Factory Direct Labor or Factory Variable Overheads do not seem to exist for the first assembly?
Is there something I am missing? Happy if I’m wrong, I’m not usually using this system so it’s very possible!
Attachment has more detail of the process flow if required.