To solve this problem, it is quite necessary to optimize the two-step
direct reduction process. In our previous study [11], the Ccritical value
was significantly decreased to 3.0–3.5 wt.% by the optimization of the
pre-reduction process, based on the investigation of the fluidization/
defluidization characteristics of carbon-coated iron ore under a fixed
high temperature condition.