The project adheres to the measures already set. By C5M tank is a tank that can withstand a pressure of more than 2.5 times the working pressure monitoring by means of pressure and water pressure of 1.7 times the pressure of the gas. When the tank pressure increased to 1.400 mmAq. Is extended up to the control room and the staff will stop filling the tank by C5M to stop the pump. When the pressure of the tank up to the control at 1.500 mmAq. Alarms from the control room. The transfer will stop the pump automatically C5M tank to prevent pressure increase (Picture 2.78).