ITEM DESCRIPTION BY BY REMARK
ADISA PEN
1 Engineering
1.1 Shop Drawing x
1.2 As built x
2 Preliminaries Include supervision
2.1 Setting up temporary facilities (for SUB) xx Site office, Storage, Shop facilities, etc.
2.2 Temporary Fence xx Except Site Boundary
2.3 Access Road xx Except Site Main Road
2.4 Inspection & Testing xx Including Setting Out, Measuring devices
2.5 Permitting x Ex. PWA
2.6 Insurance x Worker’s compensation, General liability, Equipment, and so forth
2.7 The expense for power & water x Only within site boundary
2.8 Temporary Power supply from dist. Panel xx Main feeder only supplied by PEN
2.9 Waste Disposal x Shall be delivered by sub to the waste disposal box after finished work everyday
2.10 Site Cleaning x Work area always shall be clean under control PEN
2.11 Security for Sub’s material xx
3 Material Provision xx
3.1 Equipment xx No equipment for construction supply by PEN
3.2 Scaffolding xx
3.3 Exothermic welding powder with mold xx
3.4 Unistrut channel/Angle/Channel for support xx
3.5 Paint/galvanizing for field fabricated steel support. xx
3.6 Anchor bolt/bolt/nut/washer/clamp for all of work xx
3.7 All kinds of material for Sanitary construction xx No material supply by PEN
3.8 Field fabricated support material for all of work xx
3.9 Support plate like floor mounted type shall be grouted. xx
4 Construction Work
4.1 Equipment installation xxx Ex. Pump
4.2 Equipment supply x
4.3 Sleeve work for pipe xx No pipe for sleeve is supplied by PEN
4.4 Pipe install (including insulation) xx 1) Steel pipe is supplied by PEN,
2) Shall be included unload, carries, lifting
4.5 Raw water filtrate supply system xx
4.6 Filtrated supply system xx
4.7 Recycle water for flushing system xx
4.8 Recycle water for cooling tower system xx
4.9 Wastewater collection system xx
4.10 Drinking water system xx
4.11 Underground piping xx Please refer to attached
4.12 Wastewater/Rain water drainage piping xx Connection to nearby main water drainage
4.13 Water supply/Drainage pipe for toilet xx Connection to nearby main water drainage
4.14 Sanitary Wares xx Please refer Architecture Drawing
4.15 Water supply/Drainage pipe for kitchen area xx
4.16 Kitchen equipment xx
4.17 Relocation of existing AHU,MAU, Pump, BAS System xx Please refer to attachment
4.18 Hot water supply system for kitchen xx Including insulation
4.19 Temporary water facilities xx Including pump, tank, to using point Please refer to attachment
4.20 Connect to PWA xx Shall be included permitting with PWA (Coordination)
4.21 Irrigation Water System xx
4.22 Wastewater Collection System xx
5 Documents
5.1 Material certificates x
5.2 Quality document such as for procedure, Inspection, test report, etc. x
5.3 Other documents which are needed to comply with client’s request x
6 Safety
6.1 Safety Supervisor x
6.2 PPE (Personal Protective Equipment) x
6.3 Safety Handrail, Life Guard, etc. x
6.4 Documentation for site access x
Out of Scope
ITEM DESCRIPTION BY BY REMARK ADISA PEN 1 Engineering 1.1 Shop Drawing x 1.2 As built x 2 Preliminaries Include supervision2.1 Setting up temporary facilities (for SUB) xx Site office, Storage, Shop facilities, etc.2.2 Temporary Fence xx Except Site Boundary2.3 Access Road xx Except Site Main Road2.4 Inspection & Testing xx Including Setting Out, Measuring devices2.5 Permitting x Ex. PWA2.6 Insurance x Worker’s compensation, General liability, Equipment, and so forth2.7 The expense for power & water x Only within site boundary2.8 Temporary Power supply from dist. Panel xx Main feeder only supplied by PEN2.9 Waste Disposal x Shall be delivered by sub to the waste disposal box after finished work everyday2.10 Site Cleaning x Work area always shall be clean under control PEN2.11 Security for Sub’s material xx 3 Material Provision xx 3.1 Equipment xx No equipment for construction supply by PEN3.2 Scaffolding xx 3.3 Exothermic welding powder with mold xx 3.4 Unistrut channel/Angle/Channel for support xx 3.5 Paint/galvanizing for field fabricated steel support. xx 3.6 Anchor bolt/bolt/nut/washer/clamp for all of work xx 3.7 All kinds of material for Sanitary construction xx No material supply by PEN3.8 Field fabricated support material for all of work xx 3.9 Support plate like floor mounted type shall be grouted. xx 4 Construction Work 4.1 Equipment installation xxx Ex. Pump4.2 Equipment supply x 4.3 Sleeve work for pipe xx No pipe for sleeve is supplied by PEN4.4 Pipe install (including insulation) xx 1) Steel pipe is supplied by PEN,2) Shall be included unload, carries, lifting4.5 Raw water filtrate supply system xx 4.6 Filtrated supply system xx 4.7 Recycle water for flushing system xx 4.8 Recycle water for cooling tower system xx 4.9 Wastewater collection system xx 4.10 Drinking water system xx 4.11 Underground piping xx Please refer to attached4.12 Wastewater/Rain water drainage piping xx Connection to nearby main water drainage4.13 Water supply/Drainage pipe for toilet xx Connection to nearby main water drainage4.14 Sanitary Wares xx Please refer Architecture Drawing4.15 Water supply/Drainage pipe for kitchen area xx 4.16 Kitchen equipment xx 4.17 Relocation of existing AHU,MAU, Pump, BAS System xx Please refer to attachment4.18 Hot water supply system for kitchen xx Including insulation4.19 Temporary water facilities xx Including pump, tank, to using point Please refer to attachment4.20 Connect to PWA xx Shall be included permitting with PWA (Coordination)4.21 Irrigation Water System xx 4.22 Wastewater Collection System xx 5 Documents 5.1 Material certificates x 5.2 Quality document such as for procedure, Inspection, test report, etc. x 5.3 Other documents which are needed to comply with client’s request x 6 Safety 6.1 Safety Supervisor x 6.2 PPE (Personal Protective Equipment) x 6.3 Safety Handrail, Life Guard, etc. x 6.4 Documentation for site access x Out of Scope
การแปล กรุณารอสักครู่..
รายละเอียดสินค้าโดยหมายเหตุ
1 สา ปากกาเขียนแบบวิศวกรรม
x
1.1 1.2 เป็นรอบคัดเลือก รวมถึงการสร้าง X
2
2.1 การตั้งค่าเครื่องชั่วคราว ( ย่อย ) xx เว็บไซต์สำนักงาน , กระเป๋า , ร้านขายเครื่อง ฯลฯ
2.2 ชั่วคราวรั้ว xx ยกเว้นไซต์เขตแดน
2.3 เข้าถนน xx ยกเว้นเว็บไซต์หลักถนน 2.4 ตรวจสอบการทดสอบ xx &
รวมทั้งการตั้งค่าออก , อุปกรณ์วัด
25 . การอนุญาตให้ x
x 2.6 ประกันภัยแรงงาน ชดเชยความรับผิดทั่วไป , อุปกรณ์และอื่น ๆ
2.7 ค่าใช้จ่ายสำหรับพลังงาน&น้ำเท่านั้นภายในขอบเขต
x เว็บไซต์ 2.8 ชั่วคราวแหล่งจ่ายไฟจาก dist แผง xx หลักป้อนจัดเท่านั้น โดยปากกา
x 2.9 ขยะจะถูกส่งไปโดยซบกับขยะกล่อง หลังจากทำงานเสร็จทุกวัน
2เว็บไซต์ 10 ซักแห้ง x พื้นที่ทำงานเสมอจะสะอาดภายใต้การควบคุมปากกา
2.11 ระบบย่อยของวัสดุวัสดุการ xx xx
3
1 X ไม่มีอุปกรณ์สำหรับการจัดหาอุปกรณ์ก่อสร้างนั่งร้านปากกา
X 3.2 3.3 คายความร้อนผงเชื่อมกับแม่พิมพ์ xx
3.4 unistrut ช่องมุม / ช่องสำหรับสนับสนุน X
3 สี / ข้อมูลประดิษฐ์สนับสนุนชุบสังกะสีเหล็ก X
36 ยึดโบลท์ / สายฟ้า / อ่อนนุช / เครื่องซักผ้า / ที่หนีบพวก xx
3.7 ทุกชนิดของวัสดุสำหรับงานก่อสร้าง จัดหาวัสดุสุขาภิบาล xx ไม่โดยปากกา
3.8 ด้านประดิษฐ์สนับสนุนวัสดุสำหรับงานทั้งหมด xx
3.9 สนับสนุนจานแบบติดพื้นจะบนสุด . X
4 งานก่อสร้าง
4.1 ติดตั้งอุปกรณ์ xxx . 4.2 จัดหาอุปกรณ์ปั๊ม
x
43 เสื้อทำงาน xx ไม่มีท่อสำหรับท่อแขนมา โดยปากกา
4.4 ท่อติดตั้ง ( รวมถึงฉนวน ) X 1 ) ท่อเหล็กมา โดยปากกา ,
2 ) ต้องมีขน , อุ้ม , ยก
4.5 เป็นน้ำกรองจัดหาระบบผลิตประปา X 4.6 X
4.7 ระบบรีไซเคิลน้ำล้าง xx 4.8 ระบบรีไซเคิลน้ำหอ
ระบบรวบรวมน้ำเสีย ระบบ X 4.9 X
4 เย็น10 ดื่มน้ำระบบท่อใต้ดิน xx ว่า xx
โปรดดูที่แนบ 4.12 น้ำเสีย / น้ำฝนระบายน้ำท่อ xx การเชื่อมต่อใกล้เคียงหลักระบายน้ำประปา /
4.13 ท่อระบายน้ำสำหรับห้องน้ำ xx การเชื่อมต่อใกล้เคียงหลักระบายน้ำแนว
สุขภัณฑ์ XX โปรดดูที่สถาปัตยกรรมการวาดภาพ
4.15 น้ำประปา / ท่อระบายน้ำสำหรับครัว xx xx อุปกรณ์
4.16 ครัว 4 .17 การที่มีอยู่ AHU Mau , ปั๊ม , xx ระบบ Bas โปรดดูเอกสารแนบ
. ร้อนระบบประปาห้องครัว xx รวมทั้งฉนวน
4.19 ชั่วคราวน้ำเครื่อง xx รวมทั้งปั๊ม , ถัง , การใช้จุดโปรดดูที่สิ่งที่แนบ
4.20 เชื่อมต่อกับการ xx จะรวมให้กับการประปาส่วนภูมิภาค ( ประสานงาน )
- ชลประทาน ระบบน้ำ ระบบรวบรวมน้ำเสีย XX เดือน XX
5 เอกสารใบรับรอง x
5.1 5.2 วัสดุคุณภาพเอกสาร เช่น ขั้นตอน การตรวจสอบ รายงานผลการทดสอบ ฯลฯ
x 5.3 เอกสารอื่น ๆที่จำเป็นเพื่อให้สอดคล้องกับความต้องการของลูกค้า 6 ตู้
x
x
6.2 หัวหน้า 6.1 ความปลอดภัย PPE ( อุปกรณ์ป้องกันส่วนบุคคล ) x
6.3 ความปลอดภัย handrail , ไลฟ์การ์ด ฯลฯ เ
6.4 เอกสารสำหรับเว็บไซต์การเข้าถึง x
ออกจากขอบเขต
การแปล กรุณารอสักครู่..