Please see the draft MEP for swimming pool roof top.
I would like to give and share some information regarding swimming pool with you.
1. Modification overflow gutter may be affect to structure building. Have you consulted with structural engineer?
2. Due to the modification overflow gutter, ISC needs design by using new piping system.
New piping system may be affect to existing MEP on ceiling 8 th floor, level ceiling 8 th floor, and leakage of piping may be an issue.
3. There are several point need to coring for air bubble head, jacuzzi head, overflow pipe from gutter.
Please consider and advise me if you have comment about my concept design.