* Limited Option: The requirement to meet the Initial Values tabulated above may
be delayed until 31 Dec. 2016 for processing plants that can demonstrate that the
water quality (as measured by the same set of variables) within the mixing zone
(samples taken within a few meters of the discharge pipe) and outside the mixing
zone (samples taken upstream from the discharge pipe) does not differ.