Results from the research found that the cause of the delays that have the most impact is ceramic tile floor work. The impact of the piling work steel beam reinforcements, 1st floor steel reinforcements, 2nd Floor, Plaster work outside, and covering tiles in, Brick interior walls, and plaster interior walls, and plastics. interior walls, ceramic tiled walls, granite, wood flooring, parquet.