The objectives of the Control step


The objectives of the Control step are to complete all remaining work on the project and to
hand off the improved process to the process owner along with a process control plan and other
necessary procedures to ensure that the gains from the project will be institutionalized. That is,
the goal is to ensure that the gains are of help in the process and, if possible, the improvements
will be implemented in other similar processes in the business.
The process owner should be provided with before-and-after data on key process metrics,
operations and training documents, and updated current process maps. The financial benefits
of the project should be quantified. The process control plan should be a system for monitoring
the solution that has been implemented, including methods and metrics for periodic auditing.
Control charts are an important statistical tool used in the control step of DMAIC; many process
control plans involve control charts on critical process metrics.
The transition plan for the process owner should include a validation check several months
after project completion. It is important to ensure that the original results are still in place
and stable so that the positive financial impact will be sustained. It is not unusual to find that
something has gone wrong in the transition to the improved process. The ability to respond
rapidly to unanticipated failures should be factored into the plan.
0/5000
จาก: -
เป็น: -
ผลลัพธ์ (ไทย) 1: [สำเนา]
คัดลอก!

The objectives of the Control step are to complete all remaining work on the project and to
hand off the improved process to the process owner along with a process control plan and other
necessary procedures to ensure that the gains from the project will be institutionalized. That is,
the goal is to ensure that the gains are of help in the process and, if possible, the improvements
will be implemented in other similar processes in the business.
The process owner should be provided with before-and-after data on key process metrics,
operations and training documents, and updated current process maps. The financial benefits
of the project should be quantified. The process control plan should be a system for monitoring
the solution that has been implemented, including methods and metrics for periodic auditing.
Control charts are an important statistical tool used in the control step of DMAIC; many process
control plans involve control charts on critical process metrics.
The transition plan for the process owner should include a validation check several months
after project completion. It is important to ensure that the original results are still in place
and stable so that the positive financial impact will be sustained. It is not unusual to find that
something has gone wrong in the transition to the improved process. The ability to respond
rapidly to unanticipated failures should be factored into the plan.
การแปล กรุณารอสักครู่..
ผลลัพธ์ (ไทย) 2:[สำเนา]
คัดลอก!

The objectives of the Control step are to complete all remaining work on the project and to
hand off the improved process to the process owner along with a process control plan and other
necessary procedures to ensure that the gains from the project will be institutionalized. That is,
the goal is to ensure that the gains are of help in the process and, if possible, the improvements
will be implemented in other similar processes in the business.
The process owner should be provided with before-and-after data on key process metrics,
operations and training documents, and updated current process maps. The financial benefits
of the project should be quantified. The process control plan should be a system for monitoring
the solution that has been implemented, including methods and metrics for periodic auditing.
Control charts are an important statistical tool used in the control step of DMAIC; many process
control plans involve control charts on critical process metrics.
The transition plan for the process owner should include a validation check several months
after project completion. It is important to ensure that the original results are still in place
and stable so that the positive financial impact will be sustained. It is not unusual to find that
something has gone wrong in the transition to the improved process. The ability to respond
rapidly to unanticipated failures should be factored into the plan.
การแปล กรุณารอสักครู่..
ผลลัพธ์ (ไทย) 3:[สำเนา]
คัดลอก!

มีขั้นตอนการควบคุมที่สมบูรณ์ทั้งหมดที่เหลืออยู่ทำงานในโครงการและ

ส่งการปรับปรุงกระบวนการเพื่อเจ้าของกระบวนการพร้อมกับการควบคุมกระบวนการวางแผนและขั้นตอนที่จำเป็นเพื่อให้แน่ใจว่าอื่น ๆ
กำไรจากโครงการจะต้องอยู่ในสถาบัน นั่นคือ
เป้าหมายคือเพื่อให้มั่นใจว่าผลประโยชน์จะช่วยในกระบวนการ และ ถ้าเป็นไปได้ ปรับปรุง
จะถูกใช้ในกระบวนการที่คล้ายกันอื่น ๆในธุรกิจ
เจ้าของกระบวนการที่ควรมีก่อนและหลังกระบวนการข้อมูลที่เป็นคีย์
การดําเนินงานและเอกสารการฝึกอบรม และการปรับปรุงกระบวนการแผนที่ปัจจุบัน ประโยชน์ทางการเงิน
ของโครงการควรจะวัดได้ กระบวนการวางแผนควบคุมควรเป็นระบบสำหรับการตรวจสอบ
โซลูชั่นที่ได้รับใช้รวมทั้งวิธีการและตัวชี้วัดสำหรับการตรวจสอบเป็นระยะ ๆ .
แผนภูมิควบคุมเป็นสำคัญทางสถิติ เครื่องมือที่ใช้ในการควบคุมขั้นตอน dmaic หลายกระบวนการที่เกี่ยวข้องกับการควบคุมแผนภูมิควบคุมแผน

เป็นขั้นตอนสำคัญ แผนเปลี่ยนเจ้าของกระบวนการ ควรมีการตรวจสอบหลายเดือน
หลังจากเสร็จสิ้นโครงการมันเป็นสิ่งสำคัญเพื่อให้แน่ใจว่าผลลัพธ์เดิมยังคงอยู่ในสถานที่
และมั่นคงดังนั้นผลกระทบด้านบวกจะยั่งยืน มันไม่ได้ผิดปกติเพื่อหา
มีบางอย่างผิดปกติในการเปลี่ยนแปลงเพื่อปรับปรุงกระบวนการ ความสามารถในการตอบสนองอย่างรวดเร็วเพื่อความล้มเหลว
unanticipated ควรจะเป็นปัจจัยหนึ่งในแผน
การแปล กรุณารอสักครู่..
 
ภาษาอื่น ๆ
การสนับสนุนเครื่องมือแปลภาษา: กรีก, กันนาดา, กาลิเชียน, คลิงออน, คอร์สิกา, คาซัค, คาตาลัน, คินยารวันดา, คีร์กิซ, คุชราต, จอร์เจีย, จีน, จีนดั้งเดิม, ชวา, ชิเชวา, ซามัว, ซีบัวโน, ซุนดา, ซูลู, ญี่ปุ่น, ดัตช์, ตรวจหาภาษา, ตุรกี, ทมิฬ, ทาจิก, ทาทาร์, นอร์เวย์, บอสเนีย, บัลแกเรีย, บาสก์, ปัญจาป, ฝรั่งเศส, พาชตู, ฟริเชียน, ฟินแลนด์, ฟิลิปปินส์, ภาษาอินโดนีเซี, มองโกเลีย, มัลทีส, มาซีโดเนีย, มาราฐี, มาลากาซี, มาลายาลัม, มาเลย์, ม้ง, ยิดดิช, ยูเครน, รัสเซีย, ละติน, ลักเซมเบิร์ก, ลัตเวีย, ลาว, ลิทัวเนีย, สวาฮิลี, สวีเดน, สิงหล, สินธี, สเปน, สโลวัก, สโลวีเนีย, อังกฤษ, อัมฮาริก, อาร์เซอร์ไบจัน, อาร์เมเนีย, อาหรับ, อิกโบ, อิตาลี, อุยกูร์, อุสเบกิสถาน, อูรดู, ฮังการี, ฮัวซา, ฮาวาย, ฮินดี, ฮีบรู, เกลิกสกอต, เกาหลี, เขมร, เคิร์ด, เช็ก, เซอร์เบียน, เซโซโท, เดนมาร์ก, เตลูกู, เติร์กเมน, เนปาล, เบงกอล, เบลารุส, เปอร์เซีย, เมารี, เมียนมา (พม่า), เยอรมัน, เวลส์, เวียดนาม, เอสเปอแรนโต, เอสโทเนีย, เฮติครีโอล, แอฟริกา, แอลเบเนีย, โคซา, โครเอเชีย, โชนา, โซมาลี, โปรตุเกส, โปแลนด์, โยรูบา, โรมาเนีย, โอเดีย (โอริยา), ไทย, ไอซ์แลนด์, ไอร์แลนด์, การแปลภาษา.