None of the shipments are suitable.
The vessels to Chennai and Nhava Sheva arrive 2 days apart.
We really need earlier vessels for the 1st loadings to Chennai, Nhava Sheva and Haiphong, with earlier arrival times for all 3.
What can you do if the 1st loading was 14th or 15th Oct?