In the sometime. There is a fresh units left in the loaded tube and the operator didn't observed it. then use this tube to put the passing tested unit. it is cause of mix unit.
For double flow testing, prepare the another color tube to put the passing tested unit of first option. And use the clear tube for passing tested unit of last option only.
Use the other tube for double flow testing to prevent mix unit that occur from unit left in the loaded tube.