The
present layout and operation process of each section
(i.e. material storage, cutting, machining shop,
fabrication shop, assembly and inspection section and
finish product storage) have been investigated. Ram
Prakash et al. [5] studied The Existing Plant Layout
of the Company has been designed in such a way that
there is no optimum utilization of the resources.
Travel Chart Technique is applied to minimize
wastes of time, manpower and money and to generate
higher profits for the same work from the same
resources .Two improved layout have been developed
by considering the material handling costs. W.
Wiyaratn, A. Watanapa et al [8] studied the amount
of equipments and tools in iron production are
studied. The detailed study of the plant layout such as
operation process chart, flow of material and activity
relationship chart has been investigated. The new
plant layout has been designed and compared with
the present plant layout. The SLP method showed
that new plant layout significantly decrease the
distance of material flow from billet cutting process
until keeping in ware house.