Dear beam assistant manager,
Cc Yong Jun Ni / manager,
Tomorrow will start with a new Towing Co /LEO to join the towing tank operations, preliminary drag cabinet arrangements are as follows:
NAT: 1. The thd ------ needs 8 hours installed cabinets, Leo allowed only six hours, the other 2 hours to charge by ot each 300 baht, so will still be row to NAT.
2. T & B + nelco + coda has cabinet demand drop in advance, NAT drop a cupboard charges ranging in 321~481.50 baht, Leo drop a cupboard charges 500 baht, so drop the cabinet are will first row to NAT.
The morning of the 3 ship will row to NAT: cabinet at present NAT morning arrangements trailer out drag other cabinets, that afternoon has no head can arrange the container trailer.
4 other cabinet will advance Drop NAT (reasons such as the 2 note)
The rest of the cabinet will be LEO: by the Towing Co LEO to pull the cabinet.
Leo trucking companies allow 6 hours of container loading time and after ot words per hour 300 baht charge, drop the cabinet charge 500 baht, the remaining charges were with NAT is same.
Reminder: if the cargo OK, try to arrange trouble finish loading work in 6 hours.
Know / thank you!!