This paper aims at shedding light on the advantages of Cast Blasting method over the conventional method of blasting,
to review the results of preliminary tests performed at two mine sites during 2012 and to present the results of the
simulation study conducted in collaboration with a foreign expert, including pre-optimal parameters, the simulation
of cost and production capacity increase.