The second phase of hydration (acceleration) takes
approximately from 12 to 24 hours after cinder is a
mixture with water. Thanks to hydration, especially C3S,
this phase is characteristic by the most expressive
development of hydration heat and after that the concrete
paste is in solid form with strength in the pressure about
20 MPa [6].