There was some initial resistance to performing
these calculations. The typical approach is to just select
mounts based on the expected static load and install the
mounts at convenient locations. This delay in engineering
engineering
the exhaust system produced scheduling and installation
conflicts. Given the ease and accuracy of modeling
piping systems, a decision was made to do the proper
analysis.