Step 1
Construction site selection committee selection team sites consists of Mr. Detduang Suknotrat. The Mayor of Nakhon Ratchasima as President. Mr. Sathit Phaksiphaeng Head of the Management Office of the Nakhon Ratchasima as Director and Secretary. Is responsible for studying and researching the history and legends of the city of Nakhon Ratchasima and set construction points, meet the history and travel? And I use the points of coordination with the relevant authorities. From the Education Committee It has three gates construction point. As follows:
Construction of the doors and inside the Republican City North Road intersection near the falls road and he seemed.
Construction of the doors inside the apartment is always a moat on the South at near five separate eighteenth-century new school.
Door construction troops inside the moat trip the East directly near road intersection, field marshal to Brig. Gen. million.
Step 2
The design, construction, About the construction of approximately 1.3 million to each door off.
Step 3
Financing the construction, with a lot of money greatly map.
Step 4
The construction of the tool.