The Use of Value-Stream Mapping Tools
Three of the seven value-stream mapping tools were
applied in analysis of the internal processes of the
case company. Four different products were chosen
for the analysis. In this paper, an analysis of ketchup
that was manufactured for the small marketing company
(Figure 3) is discussed. The shipments were
delivered directly to the stores almost daily. Because
the demand chain from contract manufacturer to
stores was direct, the value-stream mapping was
only done internally in the case company. The flow
of the product was followed from raw materials to
the deliveries.
Process-Activity Mapping of Ketchup. The aim
of process-activity mapping was to clarify the
value-added material flow of the product within
the company. The flow of materials was examined
at the factory level. Figure 4 presents the manufacturing
stages. The longest that raw materials
and packaging materials wait in inventory before
production starts is six months and three months,
respectively. As seen in Figure 4, both manufacturing
and packaging are fast processes. The holding
tank between manufacturing and packaging acts as
a buffer that guarantees flexibility in manufacturing.
End products are stored in the factory and the final
inventory operates on the first-in-first-out (FIFO)
principle. The mapping reveals that value-added
material flows, including manufacturing and packaging
processes, take very little time compared to
non-value-added flows. The most important waste
The Use of Value-Stream Mapping ToolsThree of the seven value-stream mapping tools wereapplied in analysis of the internal processes of thecase company. Four different products were chosenfor the analysis. In this paper, an analysis of ketchupthat was manufactured for the small marketing company(Figure 3) is discussed. The shipments weredelivered directly to the stores almost daily. Becausethe demand chain from contract manufacturer tostores was direct, the value-stream mapping wasonly done internally in the case company. The flowof the product was followed from raw materials tothe deliveries.Process-Activity Mapping of Ketchup. The aimof process-activity mapping was to clarify thevalue-added material flow of the product withinthe company. The flow of materials was examinedat the factory level. Figure 4 presents the manufacturingstages. The longest that raw materialsand packaging materials wait in inventory beforeproduction starts is six months and three months,respectively. As seen in Figure 4, both manufacturingand packaging are fast processes. The holdingtank between manufacturing and packaging acts asa buffer that guarantees flexibility in manufacturing.End products are stored in the factory and the finalinventory operates on the first-in-first-out (FIFO)principle. The mapping reveals that value-addedmaterial flows, including manufacturing and packagingprocesses, take very little time compared tonon-value-added flows. The most important waste