Aside from that, number of occurrences and
detection ability of the failures are also vital where both
demonstrate the failure rate and capability to identify it.
From all four factors, the number were then multiplied
to have the risk probability number (RPN) and used to
assess the risk of each failure. The team comprehends
that wire clamp and fonning gas nozzle hold Ingher risk
of failure when operating using copper wire for bonding
process.