● Localized wheel track cracking or edge cracking (see Figs. 3.57 and 3.58) should be repaired full depth. ● Any potholes must be repaired full depth. ● Areas which exhibit debonding must be patched. ● All existing patches must be in good repair. ● All existing cracks must be sealed. ● Crack sealing is not an acceptable treatment for cracks wider than 1 in (25 mm) as these cracks should be addressed with partial depth repairs.