Regarding MAIN COOLING WATER PIPES at Lay down B fabrication area, all these pipes supplied with covers while coming from shop. I noticed there now not even single pipe is having end cover. The grind metal powder not cleaned off, some drum and used cutting wheels still inside the pipe get rusted, even the pipe coating is getting rust inside pipe. An at present no one is working that area.