(Engineering Department).
Items on process:
- Project Pump Pond and Fountain System
- The Garden lighting
- Lift at storage room
- Fire Alarm System
- Shower room at Staff toilet
- Plug for standing fan at the terrace
- The garden pipe leaking
- Project service door shaft at under the Pavilion 5
- Air con Villa 1102 waiting equipment from Niyompanich
- Air con Pavilion 601 waiting equipment from Niyompanich
-
Items done:
- Fill the soil around the village
- Install the stainless steel number of room at the Pavilion no.1 and no2
- Painted the pole entrance lobby
- Follow up K. Patee from TPE company install the electric control box ad Pavilion no.1
- Follow up TPN come to fix the Oven In bakery room
- Repair The air con at the villa 1001
- Install shelve at bakery room
- Move office K. pong from pavilion 1 go to pavilion 2
- Change the water spray at toilet in pavilion 109
- Fix the rain shower at pavilion 109
- Filling the cement at the big jug entrance lobby
- Repair the door at entrance Accounting department
- Fix the pool system to change the fountain water valve at the swimming pool
- Follow up install the sticker at pavilion 1
- Repair the tiles pavilion 406
- Set up level the water at the fountain entrance lobby
-