Dear K. Ball and K. Mitr please check records from previous productions! Please be careful control cards were wrong! Please make sure to correct also control reports records and prepare them properly.
We need to be ready perfectly before audit, please make capa as discussed.
2 points control cards and capa I asked to verify before new NCR and when we check during new NCR we found:
1- Control card cutting sleeve wrong
2- Capability length from control report very bad and some pieces outside tolerences.