-Energy and electricity situations in Thailand
-Wind energy potentia lin Thailand
-Current status of wind energy in Thailand
-Thaila nd's wind energy policy
energy togenerateelectricity,theenergypolicyandplanning
office (EPPO)specified addersubsidiesforseveraltypesofrenew-
able energy.Therefore,smallandverysmallpowerproducers
(SPPs andVSPPs)canselltheirelectricitytotheelectricity
generatingauthorityofThailand(EGAT)ortheprovincialelectri-
city authority(PEA)athigher-than-normalprices.Windenergy
receivedaddersubsidiesofaboutUS$0.08–0.11/kWh.Thethree
southern provinces(Yala,Pattani,andNarathiwat)havespecial
adder subsidiesofUS$0.16/kWh.Thisaddersupportlasts10yr,
starting fromtheeffectivedateofthecontract [18–20].
Regardingthelong-term10-yralternativeenergydevelopment
plan (AEDP2012–2021),theMinistryofEnergyaimstoincrease
the ratioofalternativeenergyuseto25% [21] by 2021.Underthis
policy,renewableenergydevelopmentprojectswillbeinitiated
under theThailandpowerdevelopmentplan2012–2030
(PDP2010:Revision3)bytheEnergyPolicyandPlanningOffice
(EPPO). Therefore,in2030,electricitygenerationfromrenewable
energy willbe20,546.3MW,or29%oftotalelectricitygeneration.
Renewableenergysourcescanbeclassified intodomesticrenew-
able energyandrenewableenergyfromneighboringcountries,at
13,688MWand6,858MW [22], respectively.Wind-poweredelec-
tricity generationwillbeincreasedtoaproductivityofover
1800MW.In2012,Thailandhadawind-poweredelectricity
generationofaround111.7MW [23], asshownin Table5.
Obstacles todevelopmentandpromotionofwindenergyin
Thailand areasfollows:
Conclusions
Location of wind masts and wind measurements
Wind analysis of measured wind data
Economic analysis of electricity power generation from wind energy
Results and discussion
Methodology
2.1 Site Survey and 120 m tower installation
2.2 Vector map preparation
2.3 Power curve
3. Results and Discussion
3.1 Average Wind Speed Analysis
3.2 Wind speed frequency distribution analysis
3.3 Wind energy yield estimation
-Energy and electricity situations in Thailand-Wind energy potentia lin Thailand-Current status of wind energy in Thailand-Thaila nd's wind energy policyenergy togenerateelectricity,theenergypolicyandplanningoffice (EPPO)specified addersubsidiesforseveraltypesofrenew-able energy.Therefore,smallandverysmallpowerproducers(SPPs andVSPPs)canselltheirelectricitytotheelectricitygeneratingauthorityofThailand(EGAT)ortheprovincialelectri-city authority(PEA)athigher-than-normalprices.WindenergyreceivedaddersubsidiesofaboutUS$0.08–0.11/kWh.Thethreesouthern provinces(Yala,Pattani,andNarathiwat)havespecialadder subsidiesofUS$0.16/kWh.Thisaddersupportlasts10yr,starting fromtheeffectivedateofthecontract [18–20].Regardingthelong-term10-yralternativeenergydevelopmentplan (AEDP2012–2021),theMinistryofEnergyaimstoincreasethe ratioofalternativeenergyuseto25% [21] by 2021.Underthispolicy,renewableenergydevelopmentprojectswillbeinitiatedunder theThailandpowerdevelopmentplan2012–2030(PDP2010:Revision3)bytheEnergyPolicyandPlanningOffice(EPPO). Therefore,in2030,electricitygenerationfromrenewableenergy willbe20,546.3MW,or29%oftotalelectricitygeneration.Renewableenergysourcescanbeclassified intodomesticrenew-able energyandrenewableenergyfromneighboringcountries,at13,688MWand6,858MW [22], respectively.Wind-poweredelec-tricity generationwillbeincreasedtoaproductivityofover1800MW.In2012,Thailandhadawind-poweredelectricitygenerationofaround111.7MW 23, asshownin Table5Todevelopmentandpromotionofwindenergyin อุปสรรคไทย areasfollows:บทสรุปตำแหน่งที่ตั้งของเสาเครือข่ายลมและการวัดลมการวิเคราะห์ข้อมูลลมวัดลมวิเคราะห์ทางเศรษฐศาสตร์ของการผลิตพลังงานไฟฟ้าจากพลังงานลมผลและการอภิปรายระเบียบวิธี2.1 เว็บไซต์แบบสำรวจและติดตั้งทาวเวอร์ 120 เมตร2.2 เตรียมแผนที่เวกเตอร์2.3 อำนาจโค้ง3. ผล และการอภิปรายการวิเคราะห์ความเร็วลมเฉลี่ย 3.13.2 การวิเคราะห์แจกแจงความถี่ของความเร็วลม3.3 การประเมินผลผลิตพลังงานลม